GoComet Research · November 2026

Still at Sea: What the Red Sea and Hormuz Cost Global Trade

In December 2023, container lines began sending ships around the Cape of Good Hope to avoid attacks in the Red Sea.1 On 28 February 2026, after US and Israeli strikes on Iran, commercial traffic through the Strait of Hormuz effectively stopped.2 One shock made the road between Asia and Europe longer. The other shut the door to the Gulf's biggest ports.

736,635 tracked container shipments193 trade routesSailings January 2023 to September 2026
  • Red Sea1.23Mextra days at sea on Suez routes, December 2023 to July 2026
  • Red Sea32 monthsin a row with trips 11 to 17 days longer than in 2023
  • India+89%longer trip from India to the Mediterranean, against +41% from China to North Europe
  • Hormuz1 in 5of the usual shipments sailed for ports inside the strait in April 2026
  • Hormuz38 daysto reach Jebel Ali in July and August 2026, against 21 in 2025
  • Cost$3.4Mmore stock at sea for every $100M of annual trade on Suez routes

Most coverage of both crises followed the ships: how many rerouted, which lines suspended bookings, what happened to freight rates. The cargo itself got less attention. How much longer did it take to arrive? Who absorbed the delay? Where did it end up when its port was cut off?

This report follows the cargo.

The data behind this report covers 736,635 container shipments for importers and exporters on 193 trade routes, most of them starting in Asia, plus every tracked shipment into the main ports of the Gulf and the Red Sea. That gives a view of both disruptions from inside the supply chain, shipment by shipment and week by week, from January 2023 to the end of September 2026. It lets us ask questions that ship counts and freight indices cannot answer:

  • How much longer did trade between Asia and Europe take, and for how long?
  • How much inventory ended up stuck at sea, and what did that cost the companies waiting for it?
  • Why did on-time figures recover while trips stayed long?
  • Why did India's exporters pay more than China's?
  • When the Gulf's biggest ports were cut off, where did its trade go, and which ports buckled under it?
  • Did the damage stay in the Middle East?
  • What is back to normal, and what is still waiting?

The answers reach well beyond two straits. They show how global trade bends when a chokepoint closes: what it absorbs, where cargo goes instead, who pays most, and how long the effects last after the headlines move on.

Executive summary

The big picture

Two shocks have hit global trade since late 2023. The Red Sea detour made the journey between Asia and Europe longer. The Hormuz closure cut off the Gulf's biggest ports. Together they show how trade bends when a chokepoint closes. Four lessons stand out.

  1. Lesson 1$3.4Mmore stock at sea for every $100M of trade a year on Suez routes

    Trade keeps moving. The cost is time.

    Neither shock stopped trade for good. Saudi Arabia moved its imports to its Red Sea coast, and Jebel Ali was back to 92% of its 2025 shipments by August, through ports outside the strait. The cost showed up as days at sea: 11 to 17 extra days a month on Suez routes for 32 months, and a trip to Jebel Ali still almost twice its normal length in August 2026. For an importer moving $100 million of goods a year on Suez routes, that meant about $3.4 million more stock at sea at any moment.

  2. Lesson 211 dayswritten into Suez schedules within three months

    The delay becomes the schedule.

    In both shocks, carriers wrote most of the extra time into their timetables: about 11 days on Suez routes within three months, and about 12 of the 17 extra days to Jebel Ali. Once the delay is in the schedule, shipments count as on time while the trip stays long, so punctuality figures hide the cost.

  3. Lesson 3+89%longer trip from India to the Mediterranean, against +41% from China to North Europe

    Short routes suffer most.

    The same detour costs a short route the most, in proportion, so India, whose trade with Europe and the Gulf runs on short routes, paid the most. Around Africa, India's trip to the Mediterranean grew by 89%, against 41% for China to North Europe. Around Hormuz, the trip from Nhava Sheva to Jebel Ali went from 5 days to 17 (+219%), against +79% from China. Indian shipments to Jebel Ali were at 80% of their 2025 level in July and August, against more than twice for China, and freight rates from India's west coast to the Middle East rose about twentyfold.

  4. Lesson 447%on time into India's west coast after the Hormuz closure, down from 58%

    A chokepoint's reach is wider than its region.

    After the Hormuz closure, on-time arrivals on routes into India's west coast fell from 58% to 47%, and tracked cargo from Jebel Ali to East and West Africa all but stopped. The Red Sea detour added almost 8 days to the average shipment from India to the US East Coast, and kept it there for almost three years.

Seven findings

The first three concern the Red Sea, the next three the Strait of Hormuz, and the last where things stand now.

  1. 1

    The Red Sea detour lasted 32 months.

    Trips on 35 routes that normally use the Suez Canal ran 11 to 17 days longer than in 2023 in every month from December 2023 to July 2026.

    What it meansFor almost three years, two extra weeks at sea was the normal trip between Asia and Europe, the Mediterranean and the US East Coast, long after the crisis left the headlines.

  2. 2

    Carriers wrote the delay into their schedules within three months.

    By February 2024, scheduled transit on those routes was 11 days longer than in 2023.

    What it meansOnce the longer trip was in the schedule, ships counted as on time again. Importers still carried two more weeks of inventory on the water. The Gulf saw the same in 2026.

  3. 3

    The detour cost 1.23 million extra days at sea, and India's trade with Europe paid most per shipment.

    That is 12.4 days for each of 99,306 tracked shipments. India's trip to the Mediterranean nearly doubled, from 25.5 days to 48.

    What it meansGoing around Africa adds a long stretch to every Suez route. On a short route like India to Europe, that can double the trip, so Indian exporters and their European buyers took the biggest hit.

  4. 4

    Gulf trade nearly stopped, and took months to recover.

    Tracked shipments to the main ports inside the strait fell to a quarter of their 2025 level in March and a fifth in April. On the busiest routes, 18 sailed in the week of 9 March, against a 2025 average of 291 a week. By August, shipments to ports inside the strait were back to 71% of normal, and Jebel Ali's to 92%.

    What it meansGulf importers lost most of their incoming cargo almost overnight. Between March and August, about 15,700 fewer tracked shipments set out for ports inside the strait than in a normal six months.

  5. 5

    Trade moved to ports outside the strait.

    Ports inside the strait took 74% of the region's tracked shipments in 2025, 29% in March and April, and 54% in July and August. Saudi Arabia moved almost all its imports from Dammam, on the Gulf, to Jeddah, on the Red Sea.

    What it meansThe region kept importing through other ports, and the delay moved with the cargo. Jeddah became congested, and on-time arrivals from Nhava Sheva fell from 73% to 16%.

  6. 6

    The delay spread far beyond the Gulf.

    Routes into India's west coast went from 58% on time in January and February 2026 to 47% after the closure, and 42% by July. Tracked cargo from Jebel Ali to Mombasa and Tema fell from about 190 shipments a month to almost none.

    What it meansA closure in one strait showed up in ports thousands of miles away, on routes that share ships and hubs with the Gulf. In West Africa, delays had started before the closure, so not every slowdown in 2026 traces back to Hormuz.

  7. 7

    Volumes came back faster than time did.

    By August 2026, Jebel Ali was receiving 92% of its 2025 shipments through ports outside the still-closed strait, but the trip took 38 days against 21. Suez routes were still running almost 12 days long in July.

    What it meansCounting shipments makes trade look recovered. Measured in days, it is still far from normal. Cargo is flowing to the Gulf again, around the strait, and takes almost twice as long to arrive.

The rest of this report sets out the evidence behind these findings. It takes each shock in turn, starting with what happened and when: Part one on the Red Sea, Part two on the Strait of Hormuz, then Part three on how far the delay spread beyond the Gulf. It closes with the two shocks side by side, what to watch next, and notes on the data.

Part one

The Red Sea: a longer road

The detour around Africa stopped being a detour.

Watch · 1:00Part one in one minute: Red Sea Detour, built from the same GoComet tracking data.

What happened

  1. 19 November 2023

    Houthi forces seize the car carrier Galaxy Leader in the Red Sea, the first in a campaign of attacks on merchant ships3

  2. Mid-December 2023

    Maersk, Hapag-Lloyd, MSC and CMA CGM pause Red Sea transits and begin sending ships around the Cape of Good Hope1,4

  3. July 2025

    Houthi attacks sink two bulk carriers, Magic Seas and Eternity C, in the same week5

  4. November 2025

    A month after the Gaza ceasefire, the Houthis signal they have stopped attacking ships6

  5. February 2026

    Maersk and Hapag-Lloyd move one service, ME11, back through the Suez Canal, the first Gemini Cooperation service to return7

  6. September to October 2026

    Lines return to the Suez Canal in numbers. By mid-October, 63% of Far East to Europe capacity is back on the route, according to Alphaliner8,9

Only the Suez lanes got longer

On 35 routes that normally pass through the Suez Canal, shipments that sailed in December 2023 took 11.5 days longer than the same routes averaged earlier that year. Ships that had sailed in late November, weeks before the carriers paused their transits, were already running 6 to 7 days long. The extra time then stayed between 11 and 17 days in every month for 32 months. Routes from Asia that never used the canal, to the US West Coast, Southeast Asia and India, ran less than a day longer than in 2023 through 2024, and about a day longer in 2025.

The extra time was concentrated on one group of trade lanes: Asia's trade with Europe, the Mediterranean and the US East Coast, and Europe's exports to India. For importers at the end of those lanes, and for the exporters in India and China who sell to them, two extra weeks became the normal trip. Asia's trade with the US West Coast and within Asia kept close to its normal trip times.

Extra days per shipment: Suez routes against other Asian routes

Extra days at sea per shipment, against each route's own 2023 average

Suez routesOther Asian routes
Dec 2023
+11.5
−0.4
2024
+13.9
+0.6
2025
+12.8
+1.0

Extra days are measured against each route's own January to September 2023 average, with routes weighted by their 2023 volume. Other Asian routes run to the US West Coast, Southeast Asia and India. They lengthened from March 2026, during the Hormuz closure (see Part three).

October and November 2023. Trips on the 35 Suez routes run close to their 2023 average. Ships that sailed in late November are already running 6 to 7 days long.

December 2023. Carriers pause Red Sea transits. Trips jump 11.5 days longer. Schedules show only 6.7.

February 2024. Carriers have written 11.3 extra days into their schedules. The trip itself runs 14.0 days longer.

2024 and 2025. The extra time stays between 11 and 17 days, month after month. Asian routes that never used the canal stay within about a day of 2023.

July 2026. Schedule and trip have met, at +12.5 and +11.7 days. On-time arrivals are back to 53.5%, and each shipment still spends almost 12 more days at sea. Other Asian routes lengthened from March 2026, during the Hormuz closure.

The gap between the actual trip and the carrier schedule is delay that the new schedules did not cover. By mid-2026 the two had met.

GoComet tracking data · 35 Suez routes and 51 other Asian routes with 100 or more arrivals in January to September 2023 · routes weighted by 2023 volume · sailings October 2023 to July 2026

Schedules caught up. The trip did not.

By February 2024, scheduled transit on these routes was 11.3 days longer than in 2023. The trip itself was 14.0 days longer. That gap averaged two and a half days in 2024 and one and a half in 2025: schedules moved to the Cape route, and shipments still arrived later than the new schedule promised. By mid-2026 the schedule and the trip had met.

The effect is easy to miss. Once the longer trip was in the schedule, a shipment could arrive two weeks later than in 2023 and still count as on time. Punctuality figures recovered while the journey stayed long. By July 2026, 53.5% of shipments on these routes arrived on time, within a point of the 54.5% of 2023, and each one still spent almost 12 more days at sea.

What the schedules covered, and what they did not

Suez routes: extra days at sea and extra days in the carriers' schedules, against 2023; and the share arriving on time

Extra days at seaExtra days in the scheduleOn time (tick: 54.5%, the 2023 level)
Jan to Sep 2023
The 2023 trip: the baseline for every bar below
54.5%
Dec 2023
+11.5 days at sea+6.7 in the schedule4.8 days not covered
31.7%
2024
+13.9 days at sea+11.2 in the schedule2.7 days not covered
40.3%
2025
+12.8 days at sea+11.1 in the schedule1.7 days not covered
42.8%
Jan to Jun 2026
+14.0 days at sea+12.9 in the schedule1.1 days not covered
48.6%
Jul 2026
+11.7 days at sea+12.5 in the scheduleSchedule covers the trip
53.5%

35 Suez routes. Extra days are measured against each route's own January to September 2023 average, with routes weighted by their 2023 volume. On time means arriving within 24 hours of the planned arrival date recorded in GoComet.

The cost in time: 1.23 million days

Between December 2023 and July 2026, 99,306 tracked shipments arrived on these routes. Together they spent 1,227,227 more days at sea than they would have at 2023 transit times. That is 12.4 days per shipment, or about 3,360 years of cargo time.

For a business, the extra time works like extra stock. At the 12.4-day average, an importer moving $100 million of goods a year on these routes had about $3.4 million more of them on the water at any moment than in 2023. On India to the Mediterranean that figure is $6.2 million, on India to North Europe $4.5 million, and on India to the US East Coast $2.1 million (annual value multiplied by extra days, divided by 365). The trips also became harder to plan around. Shipments that arrived late were 9.5 days late on average in 2024, against 6.3 days in 2023, and the gap between a fast week and a slow week on the same route widened from about 11 days to about 15. Longer and less predictable trips mean more safety stock as well as more stock in transit.

Extra days at sea, December 2023 to July 2026

1,227,227

99,306 shipments × 12.4 extra days each · about 3,360 years of cargo time

Every $100 million of goods a year

$3.4M more of it is on the water at any moment than in 2023

Each square is $1 million. Annual value × extra days ÷ 365

Extra stock at sea, per $100M of annual trade

India to the Mediterranean$6.2M
India to North Europe$4.5M
All 35 Suez routes$3.4M
India to the US East Coast$2.1M
Days late, for shipments that arrived late, 2023 → 20246.3 → 9.5
Gap between a fast and a slow week on the same route, days11 → 15

Short routes took the biggest hit

The shorter the normal route, the more the detour stretched it in proportion. India's trip to the Mediterranean grew by 89%, almost doubling. India's trip to North Europe grew by 60%, and China's by 41%.

The detour as a share of the normal trip

Normal 2023 trip and extra days per shipment, December 2023 to July 2026, on one scale in days

Normal tripExtra days
India to the Mediterranean25.5 days normally · 3,049 shipments
+89%
India to North Europe27.7 days normally · 17,018 shipments
+60%
North Europe to India31.8 days normally · 4,163 shipments
+43%
China to North Europe35.2 days normally · 7,039 shipments
+41%
China and Korea to the Mediterranean and Black Sea54.0 days normally · 21,073 shipments
+31%
India to the US East Coast32.4 days normally · 46,964 shipments
+24%
All 35 routes33.9 days normally · 99,306 shipments
+36%

Extra days are measured against each route's own January to September 2023 average. India to the US East Coast changed least: going around Africa adds less, in proportion, to a voyage that ends across the Atlantic than to one that ends in the Mediterranean or North Europe.

India's gateway to Europe

Nhava Sheva, one of India's two biggest container ports, shows the change at route level. Its trips to Genova and Alexandria roughly doubled, from 24 and 28 days to 46 and 56. Rotterdam went from 25 days to 38 or 39 in every period since, and Hamburg from 28 to 42 or 43. New York went from 28 days to 35, and then 38.5 in 2026.

Nhava Sheva to Europe and the US: the trip before and after

Average days from sailing to arrival, January to September 2023 against December 2023 to December 2024

Jan to Sep 2023Dec 2023 to Dec 20242025 and Jan to Jun 2026
Genova
+22.1 days23.7 → 45.8 days
Alexandria
+28.3 days27.8 → 56.1 days
Rotterdam
+13.9 days24.9 → 38.8 days
Hamburg
+15.4 days27.6 → 43.0 days
New York
+6.4 days28.3 → 34.7 days
2030405060days

Beyond the data: what two extra weeks did

Public reporting from the first months of the detour shows where the delay landed beyond the shipping lines. India Ratings estimated in February 2024 that working capital cycles would lengthen by 15 to 20 days, with agriculture and textiles hit hardest.10

  • Factories paused. Tesla suspended most production at its Berlin plant from 29 January to 11 February 2024 for lack of parts, and late gearboxes cost Volvo's Ghent plant three days of output.11
  • Thin-margin exporters had the least room. CRISIL singled out India's farm commodity and marine food exporters: perishable cargo and thin margins left them little room to absorb higher freight costs. The regions this route serves take about half of India's exports.12
  • Some cargo left the sea. In the week to 14 January 2024, Xeneta recorded a 62% jump in air cargo from Vietnam to Europe.13
  • Cost spread further than delay. Asian routes that never used the canal kept their trip times. Their freight bills and punctuality still suffered. Rates from Asia to the US West Coast rose about 130% between early November 2023 and February 2024, by UNCTAD's count.14 Rerouting lifted demand for container ships by about 12% by June 2024, by Clarksons' estimate.15 Ships returned to Asia late and in clusters: about 90% of container ships reached Singapore off schedule in 2024, against an average of 77% in 2023.16 In GoComet's data, on-time arrivals on those other Asian routes fell from 70% in January to September 2023 to 57% in 2024.

What it meansCarriers built the detour into their schedules within three months. Cargo owners kept paying for 32 months: in cash tied up at sea, in freight rates on routes far from the canal, and in less reliable arrivals well beyond the Suez lanes.

Still not back when this data ends

July 2026 sailings on these routes were still 11.7 days over their 2023 level. Public reports place the large-scale return to the Suez Canal in September and October 2026, after the period this data covers. Alphaliner counted 63% of Far East to Europe capacity back on the canal by mid-October8, and BIMCO expects a full return by the first quarter of 2027.9

Part two

Hormuz: a closed door

The strait closed and stayed closed. Gulf trade stopped for a month, then came back the long way and through different ports. It paid in time, and India, closest to the Gulf, paid the most.

Watch · 0:46Part two in 46 seconds: Gulf Trade Rerouted, built from the same GoComet tracking data.

What happened

The Strait of Hormuz closed a little over two years after the Red Sea detour began, just as container lines were starting to return to the Suez Canal.

  1. February 2026

    Container lines begin returning to the Suez Canal after more than two years around Africa7

  2. 28 February 2026

    Following US and Israeli strikes on Iran, commercial traffic through the Strait of Hormuz effectively stops2

  3. Early March 2026

    Carriers suspend bookings to Gulf ports. By mid-March, Maersk accepts cargo only for ports outside the strait, among them Jeddah, Salalah and Sohar17,18,19

  4. 11 March 2026

    Saudi Arabia launches an initiative to route Gulf cargo through its Red Sea ports20

  5. 17 June 2026

    A US and Iran memorandum briefly eases the closure. Traffic through the strait rises to about 20 ships a day, against about 100 before the war21

  6. 11 July 2026

    The truce collapses and Iran declares the strait closed again. Carriers route Gulf cargo through ports outside the strait, such as Khor Fakkan, Sohar and Jeddah, and on by land22,23

  7. October 2026

    Traffic through the strait is still about 70% below pre-war levels24, and Maersk restricts bookings to Khor Fakkan and Fujairah as those ports congest25

Gulf trade stopped for a month and took months to recover

In 2025, GoComet tracked about 4,600 shipments a month sailing for the four main ports inside the strait: Jebel Ali, Dammam, Umm Qasr and Hamad. In March 2026 that fell to a quarter of the usual number, and in April to a fifth. Recovery was slow: half the usual number in June, and 71% in August. Between March and August, about 15,700 fewer shipments set out for these ports than in a normal six months, more than half the usual volume.

Shipments to ports inside the strait, month by month

Tracked shipments sailing for ports inside the strait, 2026, as a share of the 2025 monthly average (4,632 a month)

All four ports inside the straitJebel Ali alone2025 average = 100%
100%
25%33%
Mar1,165 shipments
20%28%
Apr923 shipments
37%52%
May1,730 shipments
50%65%
Jun2,319 shipments
58%71%
Jul2,682 shipments
71%92%
Aug3,312 shipments

All GoComet-tracked shipments to each port by sailing month, beyond the 193 routes used elsewhere in this report. September is left out because its sailings were still being recorded when the data was extracted.

The fall was sharpest in the first weeks. On the 15 main routes into the Gulf, 18 shipments sailed in the week of 9 March, against an average of 291 a week in 2025. Cargo already at sea when the strait closed took the longest: shipments that sailed for these ports in the week of 9 February took 62 days to arrive, against about 22 in 2025. Sailings had run unusually high in January and February 2026, so this report measures the fall against the 2025 average rather than that peak.

January 2026. Sailings on the 15 main routes into the Gulf climb well above their 2025 average of 291 a week.

February. These weeks sailed into the closure. Shipments that left in the week of 9 February took 62 days to arrive, against about 22 in 2025.

28 February: the strait closes. In the week of 9 March, 18 shipments sail on these routes.

April to June. Sailings come back slowly, to between a third and two thirds of the 2025 average, and trips run about 10 to 15 days long.

Late July and August. Sailings are back above the 2025 average, led by cargo from China. Extra days at sea stay near 20.

The highlighted weeks sailed into the closure. On these routes, led by cargo from China, sailings were back above their 2025 average by late July. Extra days at sea stayed near 20 through August.

GoComet tracking data · 15 routes into Jebel Ali, Dammam and Umm Qasr · GoComet-tracked shipments, not port throughput · extra days cover shipments that had arrived when the data was extracted · sailings January to August 2026

What it meansFor a month, Gulf importers received almost nothing by sea, and for five months they ran on a fraction of their usual supply. By August Jebel Ali was close to normal, while Dammam and Umm Qasr were still far below.

Jebel Ali's cargo came back, on a trip almost twice as long

Jebel Ali recovered fastest of the ports inside the strait. By August it was receiving 92% of its 2025 tracked shipments. The trip stayed long. On the ten main routes into the port, shipments that sailed in July and August took 38 days on average, against 21 in 2025. About 12 of the extra 17 days are in the carriers' own schedules, so the longer trip is now the planned trip.

The trip to Jebel Ali: actual against planned

10 routes into Jebel Ali: actual trip, with the carriers' planned trip marked

Actual tripPlanned trip
2025
planned 19.9
21.0 days1.6 days late on average
62%on time
Mar to Apr 2026
planned 27.6
34.0 days6.3 days late on average
63%on time
May to Jun 2026
planned 29.7
32.1 days3.0 days late on average
65%on time
Jul to Aug 2026
planned 32.4
38.4 days7.3 days late on average
48%on time

10 routes into Jebel Ali, 5 of them from China. Planned trip is the carrier's scheduled transit recorded in GoComet. Days late is the average number of days shipments arrived after their planned arrival date. Arrivals for August sailings are incomplete, so the last row is a floor.

The extra time comes from the route. With the strait still closed, carriers unload Gulf cargo at ports outside it, mainly Khor Fakkan and Fujairah on the UAE's east coast and Sohar in Oman, and move it on to Jebel Ali by road or feeder ship.23,26 That extra leg is now written into the schedule. Through June, trips ran 11 to 13 days longer than in 2025 while on-time rates stayed at their 2025 level, because the planned arrival date had moved with the trip. The rest of the extra time is congestion at the ports outside the strait. In July and August, shipments arrived more than 7 days after their planned date on average, against under 2 in 2025, and by late October Maersk was restricting bookings to Khor Fakkan and Fujairah.25

What it meansCounting shipments makes Jebel Ali look recovered. Measured in days, each shipment still spends about two and a half extra weeks on the way, and most of that time is now planned. It comes down only when ships can sail into the Gulf again.

Trade moved to ports outside the strait, and the delay followed it

The closure also changed where the region's trade comes in. In 2025, ports inside the strait received three in four tracked shipments to the region's main ports. In March and April they received under one in three, and ports outside the strait, on the Red Sea and in Oman, took the rest. By July and August the ports inside the strait were back to just over half. Between March and August, the ports outside the strait received about 7,000 more shipments than in a normal six months, close to half of what the ports inside lost.

Where the region's cargo landed

Share of the region's tracked shipments arriving at ports inside the strait (Jebel Ali, Dammam, Umm Qasr, Hamad) and outside it (Jeddah, Aqaba, Sohar)

Inside the straitOutside the strait
2025, monthly average
74%26%
4,632 inside · 1,607 outside
Mar to Apr 2026
29%71%
1,044 inside · 2,508 outside
May to Jun 2026
38%62%
2,024 inside · 3,234 outside
Jul to Aug 2026
54%46%
2,997 inside · 2,588 outside

Tracked shipments a month, all GoComet customers. Inside the strait: Jebel Ali, Dammam, Umm Qasr and Hamad. Outside: Jeddah and Aqaba on the Red Sea, and Sohar in Oman. Khor Fakkan, Fujairah and Salalah are not among the ports in this data. Cargo landed there and moved on to Jebel Ali is recorded as Jebel Ali, so this table understates the shift in the UAE's trade.

Most of the visible change is Saudi Arabia. In 2025, 57% of Saudi-bound shipments to these ports arrived at Dammam, on the Gulf. Between April and June it was 1%, and Jeddah, on the Red Sea, took the rest. Saudi Arabia launched an initiative on 11 March to route Gulf cargo through its Red Sea ports,20 and Kpler data shows Jeddah's share of the kingdom's ship calls rising from 64% before the war to 76%.27 By July and August, Dammam's share was back to 17%, and Jeddah was still receiving more than twice its 2025 volume. Iraq, with no other coast, was still receiving under a third of its usual shipments at Umm Qasr.

2025. 57% of Saudi-bound shipments to the region's main ports arrive at Dammam, on the Gulf.

March 2026. The strait closes. On 11 March Saudi Arabia launches an initiative to route Gulf cargo through its Red Sea ports.

April to June. Dammam's share falls to 1%. Jeddah, on the Red Sea, takes the rest.

July and August. Dammam's share is back to 17%. Jeddah still receives more than twice its 2025 volume, and only 16% of shipments from Nhava Sheva arrive on time.

GoComet tracking data · 4 routes into Dammam and 3 into Jeddah · GoComet-tracked shipments, not port throughput · sailings January 2025 to August 2026

Jeddah slowed under the load, and the delay came from waiting at the port. On the route from Nhava Sheva, the carriers' planned trip barely changed, from 13.2 days in 2025 to 13.7 in July and August, while the actual trip rose from 13.8 days to 18.4, after peaking at 23.1 in May and June. On-time arrivals fell from 73% to 11% in May and June, and were 16% in July and August. From Ningbo the trip grew by about 10 days, two thirds of it in the schedule. Even the two-to-three-day hop from Egypt's Red Sea coast slipped, to 39% on time in July and August. Kuehne+Nagel reported severe congestion at Jeddah in July, with its yards 89% full, and MSC introduced a congestion surcharge.28,29

Three routes into Jeddah

2025 against July and August 2026. The planned trip barely moved; the wait was at the port

From Nhava Sheva

On time16%was 73% in 2025
Actual trip13.8 → 18.4 days
Planned trip13.2 → 13.7 days

From Ningbo

On time35%was 54% in 2025
Actual trip31.2 → 41.0 days
Planned trip29.5 → 36.0 days

From Al Adabiyah, Egypt

On time39%was 65% in 2025
Actual trip3.4 → 4.3 days
Planned trip2.2 → 2.5 days

Planned trip is the carrier's scheduled transit recorded in GoComet. Trips to Jeddah were already longer before the closure because of the Red Sea crisis: from Ningbo, 21.7 days in January to September 2023.

What it meansThe ports outside the strait kept the region supplied, but they were never built for this volume. Cargo for the UAE pays in a longer route. Cargo for Saudi Arabia pays in waiting at Jeddah.

Indian exporters, closest to the Gulf, were hit hardest

The same extra leg costs a short route the most, in proportion. The trip from Nhava Sheva to Jebel Ali, normally a five-day hop, took 17 days for July and August sailings, more than three times as long. China's trip to Jebel Ali grew from 24 days to 43, by 79%. Chinese cargo lost more days, and Indian cargo lost far more of its normal timetable: for a buyer in Dubai, an order from Mumbai that used to arrive in under a week now takes two and a half weeks. Indian cargo was also slower to return. In July and August, tracked shipments from Nhava Sheva to Jebel Ali were at 80% of their 2025 level, while shipments from China were at more than twice theirs. On the way to Jeddah, Indian cargo had the worst punctuality of any route into the port, 16% on time.

Hormuz and the Red Sea: the extra leg as a share of the trip

Normal trip and extra days, on one scale in days

Normal tripExtra days
Hormuz
Nhava Sheva to Jebel Ali5.4 days normally
+219%
China to Jebel Ali23.8 days normally
+79%
Red Sea
India to the Mediterranean25.5 days normally
+89%
China to North Europe35.2 days normally
+41%

Hormuz: sailings in July and August 2026 against 2025. Red Sea: sailings from December 2023 to July 2026 against January to September 2023, as in Part one. Extra days are measured against each route's own baseline.

Public figures show the same pressure on India's exporters. West Asia takes nearly 16% of India's merchandise exports, and four weeks into the war exporters described trade with the region as at a standstill, with Jebel Ali-bound containers unloaded at other ports or sent back to Mundra and Nhava Sheva.30 By late October, spot rates from India's west coast to the Middle East had risen about twentyfold since 27 February, to $5,500 per 40-foot container, a five-year high.26 India's exports to the UAE fell 11% between April and September 2026, while exports to Oman rose 45% and to Jordan more than doubled, both served by ports outside the strait.31 Investors treated India as one of the Asian economies most exposed to the war. Foreign funds sold a record $12.7 billion of Indian shares in March, and India's main indices lagged their Asian peers.32 Analysts pointed mainly to oil, since India imports about 90% of its energy. The freight data shows a second exposure: India's exporters sit on the shortest routes into the Gulf, where the extra leg costs the most.

What it meansWhen a chokepoint stays shut, the extra leg costs most on the shortest routes, and India's trade with the Gulf is the shortest route in this data. The Red Sea showed the same pattern. For Indian exporters, both shocks landed hardest on the routes where they are closest to their buyers.

Who kept sailing, and who has not come back

Most large carriers suspended Gulf bookings in early March.17,18 In GoComet-tracked shipments, CMA CGM and Emirates Shipping Line carried more Gulf cargo during the closure than a year earlier, and MSC and Hapag-Lloyd kept most of theirs. COSCO and KMTC fell by 80% or more, and six carriers fell to two shipments a month or fewer. By July and August the picture had split further. MSC, Evergreen, Hapag-Lloyd, CMA CGM and Emirates Shipping Line were all carrying more than in spring 2025, while RCL, OOCL, Yang Ming and PIL were still at zero.

Change in Gulf shipments, by carrier

Change in tracked shipments sailing for Jebel Ali, Dammam and Umm Qasr, March to June 2026 against the same months of 2025. Right: shipments a month in July and August 2026

Carried moreCarried less
−100%0+200%Jul–Aug
CMA CGM
+403%
258
Emirates Shipping Line
+205%
128
MSC
−32%
393
Hapag-Lloyd
−14%
118
Evergreen
−63%
225
Maersk
−50%
27
COSCO
−80%
60
ONE
−85%
36
KMTC
−88%
10
RCL
−88%
0
OOCL
−92%
0
Yang Ming
−94%
0
HMM
−97%
22
Unifeeder
−99%
21
Wan Hai
−100%
28
PIL
−100%
0

Tracked shipments a month sailing for Jebel Ali, Dammam and Umm Qasr. These are shipments of GoComet customers. They do not measure a carrier's total volume or market share.

What it meansFor a Gulf importer, the choice of carrier decided whether goods moved at all, and among GoComet's customers the cargo has shifted toward the lines that kept sailing.

Beyond the data: what the closure did

Public reporting shows how far the closure reached beyond the cargo in this data.

  • The Gulf's biggest port emptied. Jebel Ali handled 374,000 TEU in the second quarter of 2026, against 3.8 million a year earlier, a fall of 90%. DP World's first-half profit fell 39%.33
  • Ships stopped calling. Between mid-July and late August, about five vessels a day passed through the strait, against about 100 before the war. Daily port calls fell 86% in Kuwait and 69% in the UAE. Saudi Arabia, which could use its Red Sea ports, lost only 15%.21
  • Getting cargo in became expensive. By July, Maersk was charging an emergency rate of $3,000 per 40-foot container for cargo to or from most Gulf countries, plus $1,000 per container on any ship that transited the strait.23 War-risk insurance rose from 0.25% of a ship's value to between 3% and 8%.2
  • Food supply was exposed. Gulf states import 80% to 90% of their food, and more than 70% of it normally comes through the strait.34
  • Exporters were caught too. In the first week of the war, about 400,000 tonnes of Indian basmati rice was stuck in transit or at Indian ports. Middle East buyers take more than half of India's basmati exports.35
  • The way around filled up. By late October, Maersk was restricting bookings to Khor Fakkan and Fujairah, the UAE's ports outside the strait, citing congestion.25

What it meansThe closure rebuilt the Gulf's supply lines around a few ports outside the strait. Cargo kept arriving, but at emergency prices, with weeks added, and through ports that were themselves congested eight months in.

Part three

Beyond the Gulf: how far the delay spread

The closure's clearest spillover landed on India's west coast. Africa lost its Gulf connection, though its delays had started earlier.

Watch · 0:52Part three in 52 seconds: Beyond the Gulf, built from the same GoComet tracking data.

The Gulf is a hub as well as a destination. Ships that serve it also serve India's west coast, and Gulf ports pass cargo on to East and West Africa. To see where the closure spread, this part compares each region with its own January and February 2026, before the closure, as well as with the same months of 2025. A drop that starts in March points to the closure. A drop already under way in January points elsewhere.

Where on-time arrivals fell, and when

Share arriving on time, 2025 (grey) against 2026 (red if worse). A drop that appears only from March points to the closure

20252026, worse2026, better
India, west coast20 routes · trip 23.3 → 24.5d
Jan–Feb
52% → 58%
Mar–Jun
60% → 47%
East Africa14 routes · trip 27.7 → 30.6d
Jan–Feb
42% → 34%
Mar–Jun
53% → 40%
West Africa24 routes · trip 44.5 → 52.6d
Jan–Feb
54% → 37%
Mar–Jun
55% → 40%
Southeast Asia19 routes · trip 12.8 → 16.2d
Jan–Feb
61% → 60%
Mar–Jun
60% → 54%
US East Coast19 routes · trip 36.7 → 42.7d
Jan–Feb
52% → 49%
Mar–Jun
63% → 57%
US West Coast12 routes · trip 21.7 → 22.7d
Jan–Feb
66% → 61%
Mar–Jun
75% → 68%
North Europe12 routes · trip 41.4 → 42.0d
Jan–Feb
45% → 40%
Mar–Jun
48% → 51%

Each pair compares 2025 with 2026 for the same months. A drop that appears only from March points to the closure. One already visible in January and February points elsewhere. On time means arriving within 24 hours of the planned arrival date recorded in GoComet.

India's west coast took the clearest hit

Routes into Nhava Sheva, Mundra and Hazira were running better than a year earlier when 2026 began: 58% of shipments arrived on time in January and February, against 52% in 2025. From March the rate fell to 47%, while the same months of 2025 had risen to 60%. It kept falling, to 42% in July and August, against 58% a year earlier. Most of the drop came on imports from China and Korea.

Port data tells the same story. Xeneta recorded the share of vessels arriving on schedule at Nhava Sheva falling from 50% to 33% in the first two weeks of the closure, and at Mundra from 44% to 31%.36 By June, import containers were waiting almost 15 days at Navi Mumbai, against about 4 before the conflict, as rerouted cargo built up.37

What it meansFor India's importers, the Gulf closure arrived as a port problem at home. Some ships and cargo meant for the Gulf ended up in Indian ports, and other shipments queued behind them.

Africa lost its Gulf connection

Jebel Ali is a staging post for trade with Africa. Between March and June 2025, GoComet tracked about 190 shipments a month from Jebel Ali to Mombasa and Tema. In the same months of 2026 there were 20 in total. Cargo that once moved through the Gulf had to find other routes. In mid-March, Mombasa expected a record 59 vessel calls in two weeks, with 33 ships waiting at anchor, and Oman's Salalah, another regional hub, suspended operations after drone strikes on 11 and 12 March.38

What it meansFor importers in East and West Africa, a closure thousands of miles away removed one of the routes their goods came by.

Africa's slowdown started before the closure

The year-on-year figures for Africa overstate what the closure did. West African trips were already 12 days longer in January and February 2026 than a year earlier, and on-time arrivals had fallen from 54% to 37%, weeks before the strait closed. Ports from Tema to Douala were congested by early February, as container volumes outgrew terminal capacity.39 East Africa's punctuality had also slipped before March and fell only a little further after it. West Africa shows no break at all when the strait closed.

What it meansAfrica's delays in 2026 had more than one cause. The closure cut a supply route, and the congestion was already there.

Asian hubs absorbed the overflow

Southeast Asia shows a break from April. Trips from India to Southeast Asia averaged 21.2 days between March and June 2026, against 17.0 a year earlier, while January and February had been close to normal. Trips within Southeast Asia stretched from 6 days to 9. As Gulf cargo was rerouted, import containers at Singapore were waiting 7.6 days by June, against about 4 before the conflict.37

What it meansThe closure pushed delay into the Asian hubs that took the overflow, adding days to routes that never go near the Gulf.

Elsewhere, little changed

Routes to the US West Coast and North Europe barely moved once the start of the year is taken into account. The US East Coast ran about 6 days longer than a year earlier, but much of that gap was already there in January and February.

Two shocks, two shapes

A longer road and a closed door did different damage, and trade adapted to each in its own way.

The Red Sea detour was a longer road to the same ports. Carriers wrote it into their schedules, and the cost settled into every shipment as extra time. The Hormuz closure cut ports off. Cargo took a longer way in or changed port, the extra time went into the schedule, and the strain moved to the ports that stayed open.

Red Sea

What happened

Lines rerouted around the Cape of Good Hope from late 2023

Routes measured here

35 routes that normally use the Suez Canal

Extra time

11 to 17 days in every month

How long

32 months in this data, to July 2026

What schedules did

Absorbed about 11 days within three months

Where the cargo went

The same ports, by a longer route

State when the data ends

July 2026 sailings still 11.7 days over 2023

Strait of Hormuz

What happened

Commercial traffic through the strait effectively stopped on 28 February 2026

Routes measured here

15 routes into Jebel Ali, Dammam and Umm Qasr

Extra time

About 17 days on the trip to Jebel Ali in July and August 2026

How long

Closed from 28 February and still largely closed when this data ends. Trips to Jebel Ali still about 17 days longer in August

What schedules did

Added about 12 days to the Jebel Ali trip

Where the cargo went

Other ports: those outside the strait took 71% of the region's shipments in March and April

State when the data ends

Jebel Ali back to 92% of its 2025 shipments through ports outside the strait, trips almost twice as long

What to watch next

This data ends with sailings of September 2026, just as the story turns. Three questions will decide how the next chapter reads.

  1. 1

    How fast do Suez routes return to 2023 transit times?

    Alphaliner counted 63% of Far East to Europe capacity back on the canal by mid-October 20268, and BIMCO expects a full return by the first quarter of 2027.9 July 2026 sailings were still 11.7 days over their 2023 level, so the gain for India and Europe could be large once ships are back.

  2. 2

    Does Jeddah keep the Gulf's cargo?

    In August 2026, Dammam received 455 tracked shipments, under half its 2025 monthly average, while Jeddah received 1,405, almost twice its own. Whether importers stay on the Red Sea coast or return to the Gulf will show whether the switch was an emergency or a lasting change.

  3. 3

    When does the strait reopen to container ships?

    Jebel Ali was back to 92% of its 2025 volume by August, but its cargo was reaching it through ports outside the strait, and the trip to Jebel Ali was still almost twice its 2025 length. Traffic through the strait was still about 70% below pre-war levels in October.24 Trips come down only when ships can sail straight in again.

About the data

All figures come from GoComet tracking data for container shipments on 193 trade routes, sailings from January 2023 to September 2026. About four in five tracked shipments start in China or India. Routes with fewer than 10 GoComet customers are left out. Port counts in Part two are the exception: they cover all tracked shipments to each port.

How the comparisons are built

ComparisonRoutesBaseline
Red Sea: Suez routes35 routes that normally use the Suez Canal: India to North Europe, the Mediterranean and the US East Coast; China to North Europe; China and Korea to the Mediterranean and Black Sea; North Europe to IndiaEach route's own average for sailings January to September 2023, routes with 100 or more arrivals in that window. Routes are weighted by their 2023 volume, so a change in route mix cannot move the result
Red Sea: other Asian routes51 routes from Asia to the US West Coast, Southeast Asia and India, and from China to Pakistan, Bangladesh and Sri LankaThe same 2023 baseline
Hormuz: Gulf routes15 routes into Jebel Ali, Dammam and Umm QasrEach route's average for 2025
Ports inside and outside the straitAll tracked shipments to Jebel Ali, Dammam, Umm Qasr and Hamad, inside the strait, and to Jeddah, Aqaba and Sohar, outside itEach port's monthly average for 2025
Spread beyond the GulfRoutes into each region, sailings January to AugustThe same months of 2025, and each region's own January and February 2026, before the closure

How to read these numbers

  • Counts are GoComet-tracked shipments. They describe the cargo of GoComet's customers. They are not port throughput or a carrier's market share. Shares and changes in days are more reliable than raw counts.
  • A shipment is a tracked container shipment, not a container count in TEU.
  • Trip length runs from sailing to arrival at the destination port. It does not depend on any planned date.
  • On-time rates understate a disruption. The planned arrival date recorded in GoComet can be updated after booking. For February sailings to Jebel Ali, the trip doubled to 46 days while 54% still counted as on time.
  • Recent months are incomplete. The data ends with sailings of September 2026. Arrivals for August are incomplete, so August trip lengths are floors.
  • The data shows what happened to cargo, not why. It holds no freight rates, surcharges or cancelled sailings. Event dates come from public reporting.

A companion report, Not All at Sea: Ocean Freight Review H1 2026, uses the same data to set out what shippers can do about carrier choice, lead times and arrival ports.

Sources

Figures not attributed to a numbered source come from GoComet tracking data: container shipments on 193 trade routes, sailings January 2023 to September 2026.

  1. Kuehne+Nagel, 15 December 2023: Maersk and Hapag-Lloyd halt Red Sea passages
  2. Shipping Australia, republishing The Conversation, 19 June 2026: the Strait of Hormuz is reopening, but global shipping won't return to normal for months
  3. gCaptain: Red Sea crisis, a timeline of maritime chaos over the past year
  4. The Maritime Executive, 17 December 2023: MSC and CMA CGM suspend Red Sea transits
  5. gCaptain: notable Houthi attacks on merchant ships in the Red Sea
  6. Marine Insight, 12 November 2025: Yemeni Houthis signal end to attacks on ships in the Red Sea
  7. Maersk, 3 February 2026: first Gemini service to transit the Red Sea
  8. Ship & Bunker, citing Alphaliner, 21 October 2026: 63% of Far East to Europe capacity back on the Suez route
  9. Seatrade Maritime, citing BIMCO, 14 October 2026: full Suez return expected by the first quarter of 2027
  10. India Ratings, via Business Standard, 9 February 2024: working capital cycles likely to lengthen by 15 to 20 days
  11. Reuters, via RNZ, 13 January 2024: Tesla and Volvo Car pause output as Red Sea shipping crisis deepens
  12. CRISIL Ratings, 25 January 2024: Red Sea crisis to have differential impact across sectors
  13. Xeneta, via Air Cargo Week, January 2024: air cargo from Vietnam to Europe up 62% in a week
  14. UNCTAD, February 2024: Navigating Troubled Waters, impact to global trade of disruption of shipping routes in the Red Sea, Black Sea and Panama Canal
  15. UNCTAD, Review of Maritime Transport 2024, chapter 2, citing Clarksons Research
  16. PSA Singapore, 10 July 2024: statement on off-schedule vessel arrivals
  17. The Maritime Executive: Maersk and Hapag-Lloyd suspend routes
  18. gCaptain: over 270,000 TEU stranded as carriers halt Gulf cargo bookings
  19. Maersk, Middle East operational update, 19 March 2026
  20. Leaders MENA: Saudi Arabia launches the Logistics Corridors Initiative, 11 March 2026
  21. Al Jazeera, 27 August 2026: how a 95 percent drop in Hormuz traffic changed global shipping
  22. Al Jazeera, 12 July 2026: Iran attacks five Gulf nations, shuts Hormuz after US bombing
  23. Maersk, 22 July 2026: Middle East operational update 40
  24. UKMTO weekly overview, via A News, 17 October 2026: Strait of Hormuz transits remain 70% below pre-conflict levels
  25. Maersk, 30 October 2026: temporary booking restrictions for Khor Fakkan, Fujairah and selected Upper Gulf destinations
  26. S&P Global Commodity Insights, 28 October 2026: West Coast India to Middle East container spot rates hit five-year high
  27. AGBI, March 2026: Saudi ports struggle with imports redirected from Strait of Hormuz
  28. Kuehne+Nagel: regional cargo flows impact operations at Jeddah Port
  29. FreshPlaza: Jeddah port faces congestion as cargo routes shift
  30. Maritime Gateway, 28 March 2026: India's Gulf exports at virtual standstill after four weeks of conflict
  31. Maritime Gateway, citing the Ministry of Commerce and Industry, 11 November 2026: India's West Asia exports fall 7.2% as Oman and Jordan record strong gains
  32. Reuters, via MarketScreener, 29 April 2026: four months in, foreign outflows from Indian shares top last year's peak
  33. Seatrade Maritime: Jebel Ali volumes plummet 90.1% in second quarter
  34. TRT World, citing Reuters, March 2026: Gulf states face food security challenge as Iran conflict snarls Hormuz shipping
  35. Business Today, citing Reuters, 3 March 2026: 400,000 tons stuck in transit as Iran conflict disrupts India's basmati exports
  36. Xeneta, 16 March 2026: Strait of Hormuz shutdown, how port congestion and schedule chaos are hitting shippers
  37. project44, 9 June 2026: three months into Hormuz disruption, congestion deepens across Asian networks
  38. The Star (Kenya), 18 March 2026: Middle East war, vessels re-routing piles pressure on Mombasa port
  39. Kuehne+Nagel, 4 February 2026: West African port congestion intensifies as carriers confront prolonged delays

See your own lanes this way

Every figure in this report comes from shipments tracked on the GoComet platform. The same view, trip times, schedules and on-time arrivals by route and carrier, is available for your own cargo.